Data Modernization

Retire the overnight batch jobs and fragile extracts, and move your reporting onto a platform you can actually evolve.

Data modernization replaces the on-premises warehouse, the pile of SSIS packages and the macro-driven workbooks with a cloud platform that has clear layers, tested transformations and controlled access.

We migrate in slices, keep existing reports running in parallel, and cut over only when the numbers reconcile. It suits teams whose reporting platform has become the bottleneck.

Business challenges we address

Today
After working with us
The nightly load fails on Tuesdays, only one person knows why, and the finance pack waits on a rerun.
Loads run on an orchestrator with alerting, retries and documented dependencies, so a failure is visible and fixable by anyone on call.
Reports query production tables directly, so month-end reporting slows the ERP and analysts avoid heavy queries.
Reporting reads from a separate analytical store, which leaves the transactional systems alone and lets analysts query freely.
Nobody dares retire the old warehouse because nobody knows which reports still depend on which tables.
We inventory report and table usage first, so decommissioning is a planned step with an owner, not a leap of faith.
Source schemas change without warning, a column vanishes, and downstream reports quietly show blanks until a user complains.
Schema checks and tests at ingestion stop bad loads early and alert the owner before bad data reaches a dashboard.

Key capabilities

  • Data Platform Modernization

    Move from ageing platforms to a modern cloud data platform, in stages.

  • Data Warehouse Modernization

    Replace ageing warehouses, SSIS jobs and spreadsheets with maintainable models.

  • Data Migration

    Planned, reconciled migrations, so reports still agree after the move.

  • Cloud Data Integration

    Pipelines that bring your systems into one cloud platform on schedule.

  • Data Architecture

    Data models and standards designed around the questions your business asks.

Approach and methodology

Step 1 of 5

Inventory

We catalog sources, jobs, tables and consuming reports, and flag everything unused, duplicated or owned by someone who has left.

Step 2 of 5

Design target

We agree platform, layers, security model and migration waves, starting with a low-risk domain that proves the pattern.

Step 3 of 5

Build and convert

We stand up ingestion and transformation for each wave, converting legacy logic with tests that compare outputs against the old system.

Step 4 of 5

Run in parallel

Both platforms feed reports for an agreed period, and differences are explained and resolved before anyone is asked to switch.

Step 5 of 5

Cut over

We repoint consumers, freeze the legacy loads, keep a rollback window, then decommission with a written sign-off.

Relevant technologies

  • Microsoft Fabric
  • Azure Synapse Analytics
  • Snowflake
  • Databricks
  • Google BigQuery
  • dbt
  • Azure Data Factory
  • Power BI
  • Apache Airflow
  • Apache Spark
  • Apache Kafka
  • Fivetran

How a project like this runs

Worked examples of how we would structure the engagement.

How you can engage us

  • Dedicated Team

    A stable team that works only on your product, with a delivery lead and shared rituals.

    Best for: Product companies with a steady backlog and a roadmap beyond a single release.

  • Staff Augmentation

    Individual engineers or analysts who join your team and work under your direction.

    Best for: Teams with managers in place and a specific skill gap or short-term capacity need.

  • Fixed-Price Project

    A defined scope, deliverables and acceptance criteria for an agreed price.

    Best for: Well-defined builds with stable requirements, a clear end state and a single decision maker.

  • Managed Service (BPO)

    We run a recurring process for you to agreed service levels, with AI on the repeat work.

    Best for: Recurring, rules-based processes you want run reliably without managing a team.

Why Intelyza

  • We run the process and build the software

    The people who do the work sit with the engineers automating it, so what gets built matches how the work happens.

  • One accountable lead

    You deal with one owner across operations and engineering. No hand-offs between a BPO vendor and a dev agency.

  • People stay in the loop

    AI handles the repetitive volume. Exceptions, approvals and judgement calls stay with named people you can talk to.

  • Measured from a baseline

    We record how the process performs before we touch it, so any change can be checked against where you started.

Questions we get asked

Will our reports break during the migration?

They should not, because we run old and new side by side and reconcile before anything is switched. Some reports will change if the old logic was wrong, and we flag those to you explicitly rather than quietly fixing them.

Do we have to replace everything at once?

No, and we advise against it. We migrate by subject area, such as sales first and then finance. Each wave has its own parallel run and cutover, which keeps risk small and gives you value earlier.

Which platform should we pick?

It depends on where your skills and licenses already sit. A Microsoft-heavy shop usually fits Fabric, while multi-cloud or heavy data science work can favor Databricks or Snowflake. We compare against your actual workloads before recommending one.

What happens to the people who maintain the old jobs?

They are part of the project. We pair with them to capture undocumented rules, and we train them on the new tooling. Their knowledge of the business rules is what makes the conversion correct.

Should we buy an ingestion tool or write custom connectors?

Buy for common SaaS sources where a managed connector exists, because maintaining API clients is a poor use of engineering time. Write custom code for niche systems, odd file drops and anything with business-specific extraction rules.

Get a consultation on Data Modernization

Send a few lines about the work. A person reads it and replies within 24 hours.